Closed, all directions. All lanes closed.
Reason for Closure: Construction
DPW is addressing a slope failure that has occurred due to concentrated runoff from Dulaney Place Culde-Sac. The contractor will be constructing a “rip-rap” conveyance channel on the embankment of Sharpe Road. The new conveyance system will safely convey the flow of the storm water runoff over the existing earth embankment and eliminate the existing erosion.
Start Date of Closure: 8/10/2020
End Date of Closure: 8/25/2020
Summary: Verette/Savidge 410-222-7973