Peninsula Park - Projects

See below for details of planning, design, and construction projects at Peninsula Park.

Project Description

This project designs and constructs the reconfiguration of two (2) existing baseball fields, the addition of a small multi-purpose field, and converts existing grass parking to more usable and formalized paved parking. The project includes stormwater management, site lighting, demolition of the vacant home, and landscaping.


Project Consultants

AECOM  


Project Status

Under construction


Project Updates

Phase 1 of the Peninsula Park Expansion project continues under construction. The Department of Public Works anticipates a December 2024 completion.
 

  2023-11-09 - Public Meeting

  2021-09-07 - Public Meeting

Project Description

Phase 2 of the project will include improvements to the existing park based on the public input received in the survey. The work is expected to include bathroom and playground renovations, additional walking paths and accessible routes, improvements and additions to sports courts, as well as landscape and stormwater management improvements.


Project Consultants

AECOM  


Project Status

In Design


Project Updates

Thank you to everyone who participated in the Peninsula Park Beautification Survey. Recreation and Parks is incredibly grateful for the 330 responses received. The Department has begun reviewing the responses submitted for inclusion in Phase 2. The top three requests from the survey are 1) expansion of the walking trails (75%), 2) dedicated pickleball courts (54%), and 3) new pavilions (41%). In addition, Recreation & Parks will review the existing playground to determine if it has reached the end of its life span and needs repair or replacement and if additional play structures can be added. The survey results are posted at the link below. Please refer back to this page for additional updates related to the next phase of work.
  

Peninsula Park Survey