Active Projects
Project Description
This project designs and constructs the reconfiguration of two (2) existing baseball fields, the addition of a small multi-purpose field, and converts existing grass parking to more usable and formalized paved parking. The project includes stormwater management, site lighting, demolition of the vacant home, and landscaping.
Project Consultants
AECOM
Project Status
Under construction
Project Updates
Phase 1 of the Peninsula Park Expansion project continues under construction. The Department of Public Works anticipates a December 2024 completion.
Thank you to everyone who participated in the Peninsula Park Beautification Survey. Recreation and Parks is incredibly grateful for the 330 responses received. The Department has begun reviewing the responses submitted for inclusion in Phase 2. The top three requests from the survey are 1) expansion of the walking trails (75%), 2) dedicated pickleball courts (54%), and 3) new pavilions (41%). In addition, Recreation & Parks will review the existing playground to determine if it has reached the end of its life span and needs repair or replacement and if additional play structures can be added. The survey results are posted at the link below. Please refer back to this page for additional updates related to the next phase of work and the current construction project. The Department of Recreation and Parks welcomes comments via email at drp_capital-projects@aacounty.org .
2023-11-09 - Public Meeting
- Peninsula Park Expansion Construction Drawings
- Peninsula Park Expansion Pre-Construction Community Meeting
- Peninsula Park Expansion Public Meeting
2021-09-07 - Public Meeting