Ridge Road Corridor – Safety and Congestion Study (June 2024) |
Safe Routes To School Accessibility Studies (Phase 1) (December 2023) |
Brooklyn Park Neighborhood Transportation Study Final Plan (October 2023) |
Forest Drive Safety Study Final Report (July 2023) |
Conway Road from MD 3 to the Western Terminus (2022) |
US 50/MD 665 Truman Park and Ride Ramp Feasibility Study (July 2022) |
Jumpers Hole Road Study from MD 2 to MD 177 (August 2022) |
Waugh Chapel Road, Phase 2 Final Report (May 2022) |
MD 32 Enhanced Bus Facility Study (2021) |
Riva Road Trail Corridor Study (2021) |
Parole Mobility Study (2020) |
Anne Arundel County Transportation Center Feasibility Study (January 2020) |
Waugh Chapel Rd Study (from Maytime Drive to New Market Lane) (August 2019) |
MD 214 Study (from MD 468 East) (August 2019) |
Edwin Raynor Boulevard from Old Crown Drive to Fort Smallwood Road (MD 173) (March 2018) |
Solley Road from Mountain Road (MD 177) to Ft Smallwood Road (MD 173) (January 2018) |
Governor Stone Parkway from Benfield Boulevard to East West Boulevard (January 2018) |
Clark Road from Jane Court/Gleneagle Drive to Watts Avenue |
Jennifer Road Sidewalk (August 2018) |
Jumpers Hole Road from Benfield Boulevard to Kinder Road/Earleigh Heights (February 2018) |
MD 176 (Dorsey Road) Shared Use Path Feasibility Study (September 2017) |
Odenton Senior Path (March 2017) |
Ridge Road (MD 713) from MD 175 to MD 176 (January 2017) |
Stewart Avenue and Old Stage Road (November 2016) |
MD 170 (Telegraph Road) from MD 174 (Reece Road) to MD 100 Feasibility Study (June 2016) |
B&A Trail and Broadneck Trail Connector (May 2016) |
Odenton Area Sidewalks (February 2016) |
MD 177 from MD 2 to Magothy Beach Road (July 2015) |
Race Road/Jessup Village (June 2015) |
Mountain Road (MD 177) from Solley/Waterford Road to Edwin Raynor Boulevard (March 2015) |
MD 168 (Nursery Road) Feasibility Study (July 2014) |
Odenton MARC Garage (January 2013) |
Pedestrian and Bicycle Master Plan Update (2013) |
West Nursery Road from Hammonds Ferry Road to Elkridge Landing Road (February 2011) |
MD 175 Phase II from MD 170 to School Lane (July 2010) |
Staples Corner (July 2008) |
Pedestrian and Bicycle Master Plan (2003) |